Boat Plans Canada | Fuel system is complete

,

Boat Plans Canada




The fuel delivery end of the job is complete with the main engine and generator connected to the day tank. It was kind of anti climatic as I screwed down the last hose clamp, and realized I have no more work to do on the fuel system.

I installed check valves after the manifold. I was worried that one engine might try to pull fuel out of the other engine. I spoke with a few diesel mechanics, and all agreed that check valves would not hurt and were probably needed.

The line supplying the main engine after the manifold is 3/8" coast guard rated rubber fuel line. The return line from the main engine is the same rubber line only in 1/4". I had JIC fittings crimped on the fuel supply line for the main engine and used push on connectors for the returns.

I routed the supply and return for the main engine through the engine bed. I used a hole saw to create the bores, and then used 1 1/2" rubber grommets to pretty up the bore and prevent any chaffing of the lines. I used the same detail on the generator supply and return

The line feeding the generator is 5/16 coast guard rubber fuel line,and the return line is the same 1/4". I had to bush the return line up from 3/16 @ the generator return port. The fuel supply line on the generator is a push on connector as the generator manufacturer uses the Banjo style fitting at the fuel inlet.

The 1/2" electric priming pump looks as if it is not going to work. I got the pump to prime with a 5 piece of brake line and a bucket of fuel. However, in the real world, the pump will not pick up the fuel once I have it installed and it has to lift through the fuel filter, pipe network, valves and four feet of lift. I have to re visit the electric priming pump and get a model pump that can handle the lift and friction loss Im placing upon it.

All the return fuel lines enter the tank at return manifold.

While both engines could be fired now, Im really not ready as I want to get the exhaust systems completed for both engines. Im working on the generator wet exhaust first, then Ill attack the dry exhaust for the main engine. Since Im going to be doing the generator wet exhaust, I need to finalize the wiring in the lazzerette and finish sheathing that room. Once the lazzerete is sheathed, I can make the wet exhaust connections and check another item off the list. Im at the point now that I want to be able to scratch these jobs off of the list and not have to re visit them. This order of work is logical as I wont be able to start the steering system until the lazzerete is completed, and the bulky wet exhaust gear is installed.

Since I am now working on the wet exhaust system for the generator, I might as well install the sea chest as the generator will be needing its cooling water. I even hung a spare gasket for the flange connector, and the wrench for the strainer housing. Once the wet exhaust is completed, I can fire the generator. The numbers you see in the last picture is how I labeled the fuel tanks. #2 is the 200 gallon day tank, and #1 is one of the 500 gallon storage tanks.

Do you find information about Boat Plans Canada are you looking for? If not, below may help you find more information about the Boat Plans Canada. Thank you for visiting, have a great day.

0 komentar to “Boat Plans Canada | Fuel system is complete”

Posting Komentar

 

Boat Plans For A Chesapeake Deadrise Copyright © 2016 -- Powered by Blogger