Senin, 07 Maret 2016

Boat Plans Skiff | The devils in the detail

,

Boat Plans Skiff


I thought I was pretty much wrapped up with the wiring and plumbing to the point of where I could begin installing the Cherry plywood on the hull sides and partitions.

I was looking at the route of one of my water tank fill lines on the starboard side, and started to get concerned that I was making things a little too tight in regard to the fill lines and the lines for my future air conditioning unit. I decided to re route one of the water tank fill line to give me, what I consider, barely enough room to route the two cooling lines for my AC unit. Out comes the hole saw so I can create an 1 1/2" bore through frame #8. Hole sawing complete, so now I have to de-burr the hole, put a couple of layers of epoxy primer, give the primer a day to set up, then top coat with a couple layers of acrylic enamel. That little hole slowed things up a minimum of one day.

I also was looking at the steel door jamb of the engine room door, and somehow the bright white door jamb was not going to look so good next to the ever darkening Cherry interior. I decided to paint the door jamb brown to make things "flow" a little smoother as far as the eye was concerned. I had some left over acrylic urethane from another project, and while it could have been a little lighter in shade, I have formally called it good enough.

I picked up a few hundred #12 1 1/2 brass wood screws from Fastenal today, and barring any more nit picking, I should begin some finishing work after the holiday weekend.

Do you find information about Boat Plans Skiff are you looking for? If not, below may help you find more information about the Boat Plans Skiff. Thank you for visiting, have a great day.

0 komentar to “Boat Plans Skiff | The devils in the detail”

Posting Komentar

 

Boat Plans For A Chesapeake Deadrise Copyright © 2016 -- Powered by Blogger